Independent Guarantee under Article 2321 of the Civil Code: Manifest Abuse, Object and Administrative Jurisdiction (Cass. com., 1 April 2026, No. 24-13.364, Published in the Bulletin)

You have given an independent guarantee (garantie autonome) as part of a complex commercial contract. The beneficiary calls it for a colossal sum, in a context you consider abusive or even fraudulent. Can you refuse to pay? That is precisely the question the French Supreme Court (Cour de cassation) has just answered in a noteworthy judgment of 1 April 2026, published in the Bulletin. At stake: €47 million claimed by SNCF Gares & Connexions from New immo holding, in connection with an aborted station redevelopment project. The Court’s answer is scathing and instructive: manifest abuse or fraud is not to be presumed, and the lower courts have no jurisdiction to decide matters that fall to the administrative court. A judgment you absolutely must know if you are a guarantor or likely to become one.

Cour de cassation, Commercial, Financial and Economic Chamber, 1 April 2026, Appeal No. 24-13.364, Published in the Bulletin

🔑 Key Takeaways

  • The independent guarantee is governed by Article 2321 of the Civil Code (code civil): the guarantor may not, in principle, raise any defence derived from the underlying contract.
  • Only two exceptions allow the guarantor to block payment: a call outside the object of the guarantee, or manifest abuse or fraud by the beneficiary.
  • The abuse or fraud must be manifest, that is, immediately and indisputably obvious: a breach that is merely contested before the competent court is not enough.
  • To assess whether the call complies with the object of the guarantee, the judge must refer both to the guarantee contract and to the underlying contract in consideration of which it was given.
  • Where a dispute over the forfeiture of a concession holder is pending before the administrative court, only that court can find that the beneficiary’s fault is manifest.
  • The sum awarded reaches €47 million, with interest at the statutory rate from 18 January 2022.
  • The judgment is published in the Bulletin: it is intended to become case law and to guide practitioners.
Table of Contents ▼

What Is the Background to This Judgment?

What Was the Contractual Arrangement at Issue?

To understand the scope of this decision, one must first grasp the complexity of the arrangement that gave rise to it. In February 2019, two major players joined forces to create a single-purpose mixed-economy company (société d’économie mixte à opération unique, SÉMOU) dedicated to the renovation of a major Paris railway station. On one side, SNCF Gares & Connexions (SNCF G&C), which holds 34% of the capital. On the other, Ceetrus Paganor, a subsidiary of New immo holding (NIH), which holds 66%.

On 22 February 2019, SNCF G&C granted this joint company (let us call it GdN 2024) a concession to carry out the redevelopment project, in return for the right to operate the station’s commercial spaces not strictly devoted to rail use. This is a classic public-private partnership model in the rail sector: the rail operator brings its infrastructure, the private partner brings its capital and its commercial real estate expertise, and the two share the operating revenues.

In this type of arrangement, the question of financial security is central. This is where the independent guarantee comes in: Article 17.3 of the concession contract requires NIH to give a performance guarantee (garantie de bonne fin) in favour of SNCF G&C, intended to secure the actual completion of the works. This guarantee, which is annual, was renewed by a contract of 29 March 2021 and amounts to €47 million.

📖 Definition: Performance Guarantee (Garantie de bonne fin)
A performance guarantee is a commitment by which a guarantor (here NIH) undertakes, towards a beneficiary (here SNCF G&C), to pay a specified sum if the principal debtor (here GdN 2024) fails to complete the agreed works. It is called “independent” because it is separate from the underlying contract: the guarantor cannot raise against the beneficiary the arguments that the principal debtor might raise.

🏗️ Diagram of the Contractual Arrangement

SNCF G&C (34%) + NIH via Ceetrus Paganor (66%)
↓ together form
GdN 2024, a single-purpose mixed-economy company
↓
Concession contract (22 Feb. 2019)
SNCF G&C → GdN 2024: station redevelopment assignment
In exchange: right to operate the non-rail commercial spaces
↓
Independent guarantee (Art. 17.3 of the contract)
NIH → SNCF G&C: performance guarantee for the works
Amount: €47 million, renewed on 29 March 2021

How Was the Guarantee Triggered?

The project initially proceeded normally, then difficulties arose. On 21 September 2021, SNCF G&C declared the forfeiture of the concession holder (déchéance du concessionnaire), that is, unilateral termination of the contract at GdN 2024’s fault, citing “serious faults” on its part, and in particular a “culpable and irremediable delay” in carrying out the works, in accordance with Article 52.1 of the concession contract.

GdN 2024 did not accept this and immediately challenged the forfeiture before the administrative court, which alone has jurisdiction to rule on the lawfulness of a decision taken under a concession contract. NIH, for its part, argued that the alleged delays were not established, in particular because the timetable had been modified by successive amendments, and that the project had been unilaterally abandoned by SNCF G&C.

Despite this pending dispute, SNCF G&C did not wait for the administrative court’s decision: by registered letter of 18 January 2022, it called the independent guarantee for the full €47 million and summoned NIH for payment before the Paris Commercial Court (tribunal de commerce de Paris).

📅 Timeline of the Case

7 Feb. 2019 → Incorporation of GdN 2024
22 Feb. 2019 → Signing of the concession contract
29 March 2021 → Renewal of the independent guarantee
21 Sept. 2021 → SNCF G&C declares the forfeiture of GdN 2024
Late 2021 → GdN 2024 challenges the forfeiture before the administrative court
18 Jan. 2022 → SNCF G&C calls the independent guarantee (€47M)
22 Sept. 2023 → Paris Commercial Court: NIH ordered to pay
27 March 2024 → Paris Court of Appeal: judgment upheld
1 Apr. 2026 → French Supreme Court: appeal dismissed

Both the Paris Commercial Court (22 September 2023) and the Paris Court of Appeal (27 March 2024) ordered NIH to pay. The Court of Appeal added that this award is to be set against any award the administrative court might eventually make against GdN 2024. NIH appealed on points of law, and it is this judgment of 1 April 2026 that we are going to dissect.

What Is the Independent Guarantee and Why Is It So Formidable?

Why Can the Guarantor Not Raise the Principal Debtor’s Defences?

📖 Definition: Independent Guarantee (Article 2321 of the Civil Code)
The independent guarantee is the commitment by which the guarantor undertakes, in consideration of an obligation entered into by a third party, to pay a sum either on first demand or on agreed terms. Its fundamental characteristic is its independence: the guarantor cannot raise any defence derived from the guaranteed obligation (nullity of the underlying contract, non-performance by the beneficiary, set-off, etc.). It must pay first, and the principal debtor challenges afterwards.

The independent guarantee, sometimes called a “first demand guarantee” when it is payable unconditionally, is the most powerful security instrument that exists in French contract law. It differs fundamentally from the surety (cautionnement), with which it is often confused in practice.

In a classic surety, the surety can raise against the creditor all the defences the principal debtor could have raised: if the underlying contract is void, if the creditor itself has failed in its obligations, if the debt is time-barred, the surety can in principle rely on this to refuse to pay. The independent guarantee works the other way round: it is disconnected (“independent”) from the underlying relationship. Whether there is a dispute, whether the principal debtor contests its fault, whether the beneficiary has itself breached its commitments, none of this concerns the guarantor. It must pay.

This strictness is no accident. The independent guarantee was designed for commercial transactions in which speed and certainty of payment are essential: construction contracts, international contracts, public tenders. A beneficiary who has obtained an independent guarantee must be able to be paid without being drawn into a lawsuit that can last for years.

⚖️ Independent Guarantee vs Surety: The Essential Differences

Surety
Ancillary to the underlying contract
The surety can raise the debtor’s defences
Conditional commitment
Easy recourse against a beneficiary at fault
Independent guarantee
Independent of the underlying contract
The guarantor cannot raise defences
Unconditional (or almost) commitment
Limited recourse: only manifest fraud or abuse

How Important Is the Object of the Guarantee?

Even though the independent guarantee is independent of the underlying contract, it is not for that reason disconnected from all contractual reality. Article 2321 of the Civil Code specifies that it is given “in consideration of an obligation entered into by a third party”. This means it was given to secure a precise objective, a specific object.

And this is a point that the judgment of 1 April 2026 consolidates clearly: to assess whether the call on the guarantee complies with its object, the judge must refer not only to the guarantee contract itself, but also to the underlying contract in consideration of which the guarantee was given. In other words, if the call relates to something that exceeds or distorts the object for which the guarantee was given, it may be illegitimate.

In the case before us, NIH argued that the performance guarantee could only be used to secure completion of the works of the initial project, and not to cover other losses linked to the alleged abandonment of that same project by SNCF G&C. This is a serious argument in theory, but it did not convince the successive courts, for reasons we are going to examine.

What Are the Only Two Exceptions to the Principle of Independence?

What Is a Call Outside the Object of the Guarantee?

The first exception to the guarantor’s obligation to pay is the call outside the object of the guarantee. If the beneficiary triggers the guarantee to obtain payment of a sum that does not correspond to what the guarantee was meant to cover, the call is illegitimate.

Take a concrete example: a guarantee of performance of the construction works on building A cannot be called to cover defects in a separate building B, even if the two projects are contractually linked. The object of the guarantee delimits the scope of the guarantor’s obligation.

In the case under comment, NIH argued that SNCF G&C had “abandoned the project” and opted for “works radically different in nature, purpose and scale”, which would make the call foreign to the object of the guarantee. The Court of Appeal, approved by the French Supreme Court, dismissed this argument, finding that the guarantee had indeed been called in consideration of the concession contract, without distorting it or diverting it from its function. The fact that the future use of the sums called by the beneficiary is uncertain or different from the initial plans is held to be “immaterial to the guarantor’s obligation to pay”.

How Is Manifest Abuse or Fraud Established?

📖 Definition: Manifest Abuse or Fraud
Manifest abuse consists in calling the guarantee in bad faith, knowing full well that one is not entitled to it. Manifest fraud consists in artificially bringing about the conditions for the call, for example by creating oneself the breach that one invokes against the guarantor. In both cases, “manifest” means that the proof must be immediate and obvious, requiring no in-depth investigation: if a trial is needed to decide the matter, the condition is not met.

This is the heart of the judgment of 1 April 2026, and the French Supreme Court’s most important contribution to the subject. The question was this: is the fact that a contractual breach is contested before the competent court enough to establish manifest abuse or fraud? The answer is no, and the Court states it as a general principle worth quoting in full:

“A call on a guarantee based on a contractual breach whose reality is contested before the competent court and whose attribution to the guaranteed debtor is not devoid of any foundation does not constitute manifest abuse or fraud within the meaning of that provision.”

This wording is remarkably rigorous. It sets two cumulative conditions for a call to be considered non-abusive: first, the breach relied on is genuinely contested before the competent court (a procedural condition); second, that breach is not devoid of any foundation as regards its attribution to the debtor (a substantive condition). If both conditions are met, the call on the guarantee cannot be characterised as manifest abuse or fraud, and the guarantor must pay.

🔍 The Manifest Abuse or Fraud Test: What the French Supreme Court Says

❌ NOT enough to establish manifest abuse:
– The beneficiary has started parallel, contested proceedings
– The initial project was modified or even abandoned
– Deadlines were extended by amendments
– The debtor disputes responsibility for the delays
✅ What COULD establish abuse or fraud:
– A call on an object totally foreign to the guarantee
– Immediate and indisputable proof that the beneficiary itself caused the breach
– Collusion between the beneficiary and the instructing party
– A call after the guarantee has expired or beyond the guaranteed amount

What Exactly Does the Judgment of 1 April 2026 Contribute?

Why Is the Administrative Court Decisive in This Case?

One of NIH’s most original arguments deserved particular attention: it argued that the forfeiture declared by SNCF G&C was itself unlawful, that the delays relied on were not established, and that it was SNCF G&C that had artificially brought about the conditions of its own forfeiture, which would amount to manifest fraud.

The difficulty lies in the nature of the contract in question. The development concession contract that bound SNCF G&C to GdN 2024 falls under administrative law. A challenge to the forfeiture of the concession holder is therefore brought before the administrative court. The civil courts, the Commercial Court and the Court of Appeal, have no jurisdiction to decide that question. They therefore cannot themselves rule on the lawfulness of the forfeiture.

The French Supreme Court validates this reasoning clearly: as long as the administrative court has not ruled on the lawfulness of the forfeiture, it is impossible for the civil judge to hold that the manifestly culpable nature of the reliance on the delay is established. In other words, the absence of a final decision from the competent court is precisely what prevents the call from being characterised as fraudulent or abusive. The apparent paradox, that the civil judge must order payment before the administrative judge has ruled, is in fact the direct and accepted consequence of the principle of independence of the guarantee.

This point is fundamental for practitioners. In any arrangement involving a public-law or mixed contract backed by a private-law independent guarantee, the guarantor cannot suspend its obligation to pay while awaiting the administrative court’s decision. It must pay, then turn against the instructing party if the administrative court ultimately finds the beneficiary at fault. This is precisely why NIH’s award is made “to be set against any award that the administrative court may make” against GdN 2024: the civil judge acknowledges that the administrative dispute has not been decided, and that the civil award is not definitively to NIH’s detriment if the administrative court finds SNCF at fault.

What Standard of Proof Must the Guarantor Meet?

NIH had developed a detailed argument on the amendments modifying the timetable, arguing in particular that Amendment No. 2 of 4 January 2021 envisaged “discussions on a new timetable to be defined by 31 December 2021 at the latest”, which meant that the deadlines had not yet expired when the forfeiture was declared in September 2021. It also argued that the modifications imposed by the municipal authorities had extended the deadlines without this being attributable to it.

The French Supreme Court approves the lower courts for having dismissed these arguments, not because they are unfounded in themselves, but because they do not make it possible to establish the manifestly culpable nature of SNCF G&C’s reliance on the delay. There is doubt, discussions are under way before the administrative court, and amendments took certain delays into account as “legitimate grounds for extending deadlines”, but all of this generates factual and legal uncertainty that is incompatible with the standard of manifest fraud or abuse.

This shows that the word “manifest” in Article 2321 of the Civil Code has a very strong technical meaning: it is not merely what is “obvious” in everyday language, but what is indisputable, immediately perceptible without in-depth investigation, leaving no room for assessment. As soon as any doubt remains, and here an entire administrative trial remains, the call on the guarantee cannot be characterised as abusive or fraudulent.

⚠️ Warning
NIH’s award is provisional in the economic sense of the term: it is made “to be set against” what the administrative court may order GdN 2024 to pay to SNCF. If the administrative court rules in GdN 2024’s favour and finds that the forfeiture was unjustified, SNCF G&C will have to return the sums. But NIH will have to await that decision, with no certainty as to its outcome or as to SNCF G&C’s future solvency.

What Are the Practical Consequences for Guarantors and Their Advisers?

How Should an Independent Guarantee Be Properly Drafted or Negotiated?

The New immo holding case is first and foremost a lesson in contract drafting. It shows that a guarantor giving an independent guarantee must be extremely vigilant about the definition of its object, because that is the only ground on which it can, even before raising fraud or abuse, challenge the legitimacy of a call.

Several precautions are worth building into the drafting or negotiation of any independent guarantee. The definition of the object must be precise and detailed: instead of a general formula such as “completion of the project”, the works concerned, their timetable, their amount, and the objective conditions under which the guarantee may be called should be set out in detail. The more precisely the object is defined, the easier it will be to show that a call is outside its scope.

It is also advisable to include in the guarantee a clause requiring prior notification of a call, allowing the guarantor to react before being forced to pay. Likewise, providing for a clause automatically reducing the guaranteed amount as the works progress helps limit the guarantor’s exposure.

Finally, where the underlying contract is governed by public law or is likely to generate disputes before the administrative court, it is imperative to state this expressly in the guarantee and to anticipate the consequences of a challenge before that court for the guarantor’s obligation to pay.

📋 Checklist: Clauses to Negotiate in an Independent Guarantee

✅ Precise and exhaustive definition of the guaranteed object
✅ Decreasing amount linked to the progress of the works
✅ Notice clause before any call
✅ Obligation to give documented justification for the call
✅ Automatic return clause in the event of a favourable court decision
✅ Explicit reference to the underlying contract and its amendments
✅ Strictly defined duration clause (avoid automatic renewals)

What Remedies Are Available After Paying Under an Independent Guarantee?

Payment under an independent guarantee is not necessarily the last word. Even after paying, the guarantor has several avenues of recourse, the value of which obviously depends on the circumstances.

First, a guarantor who has paid has a subrogation or personal claim against the instructing party, that is, against the principal debtor whose obligations it guaranteed. This is the very logic of the guarantee: the guarantor pays in place of the debtor, but keeps its recourse against it. In the case under comment, this means that NIH, once it has paid the €47 million to SNCF G&C, will be able to turn against GdN 2024 to be reimbursed, subject, of course, to the latter’s solvency.

Second, if the beneficiary committed a fault in calling the guarantee, even if that fault does not reach the threshold of manifest abuse or fraud required to block payment, it may be ordered to pay damages after the event. The threshold required to obtain compensation in civil liability is lower than that required to block payment urgently.

Third, and this is precisely what the New immo holding case illustrates, the civil award can be structured as being “set against” a future award by the administrative court. If that court rules in GdN 2024’s favour and orders SNCF G&C to pay it sums, those sums may offset or absorb the €47 million already paid under the guarantee.

🔄 The Guarantor’s Remedies After Payment

1. Recourse against the instructing party (principal debtor)
→ Subrogation or personal claim to obtain reimbursement of the sums paid
2. Liability claim against the beneficiary
→ If fault in the call is proved (even below the threshold of manifest abuse)
→ Claim for damages
3. Coordination with the competent courts
→ Await the administrative court’s decision on the forfeiture
→ Rely on the award “to be set against” later awards to reduce the final balance due

On the procedural side, it should also be noted that summary proceedings (référé) can be a powerful tool before payment, but only if the abuse or fraud is so manifest that no investigation is needed. The summary judge may order the lifting of an abusive or fraudulent call on a guarantee, but as this judgment shows, the threshold is very high and difficult to reach in practice. In case of doubt, the guarantor should not count on summary proceedings to protect itself.

Conclusion

The judgment of 1 April 2026, published in the Bulletin, is an important stone in the case-law edifice of the independent guarantee. By refusing to find manifest abuse or fraud in a nonetheless complex context (abandoned project, contested forfeiture, amendments modifying the timetable, potentially shared fault), the French Supreme Court forcefully recalls that the independent guarantee is an instrument of certainty, not of debate.

The central lesson is twofold. For guarantors, first: the word “manifest” in Article 2321 of the Civil Code is a very high barrier. If a dispute is under way, if a competent court has not yet ruled, if the breach relied on is not devoid of any foundation, the call on the guarantee will be considered regular and the guarantor will have to pay. For beneficiaries, next: the independent guarantee is a powerful tool that allows them to obtain liquidity quickly, but this power is bounded by the object of the guarantee and by the prohibition of abuse or fraud, whose definition is admittedly narrow but real.

For anyone who may have to give, call or challenge an independent guarantee, this judgment is essential reading. If you are facing a similar situation (a call on an independent guarantee in a disputed context, a contractual arrangement mixing public and private law, or a question about remedies after payment), the lawyers at lebot-avocat.com, who specialise in banking and financial law, can help you analyse your situation and defend your interests.

FAQ: Frequently Asked Questions

Can a call on an independent guarantee be blocked urgently before the court?
Yes, but the threshold is extremely high. The summary judge (juge des référés) may order the lifting of a call on an independent guarantee, but only if the abuse or fraud is “manifest”, that is, immediately obvious and indisputable without in-depth investigation. In practice, if the beneficiary can put forward any serious argument to justify the call, the summary judge will refuse to block payment. The judgment of 1 April 2026 illustrates this difficulty well: even in a complex context where the forfeiture of the concession holder was contested before the administrative court, the threshold of manifest abuse was not reached. If you think you are the victim of manifest abuse or fraud, act with extreme urgency, because the time between receipt of the call and actual payment can be very short.
What is the difference between an independent guarantee and a surety in a construction contract?
The difference is fundamental. In a surety (cautionnement), the surety is “ancillary” to the main contract: it can raise against the creditor all the defences the principal debtor could have invoked (defect in the contract, creditor’s non-performance, set-off, etc.). In an independent guarantee, the guarantor is bound to pay regardless of any dispute between the beneficiary and the debtor. If your construction contract provides for an independent guarantee rather than a surety, you are in a much more exposed position as guarantor: you must pay first, and are left with subsequent remedies. This is why it is vital to check, before signing, the exact characterisation of the security you are giving.
If I have paid under an independent guarantee and believe the call was unjustified, can I recover the sums paid?
Yes, avenues of recourse exist after payment, even though they are more uncertain. You can, on the one hand, turn against the principal debtor whose obligations you guaranteed: this is the subrogation claim, which places you in the rights of the creditor you have just paid. On the other hand, if the beneficiary committed a fault in calling the guarantee, even without reaching the threshold of manifest abuse that would have made it possible to block payment, you can bring a civil liability claim and seek damages. Finally, as in the case under comment, if the award was made “to be set against” a future decision of another court, a favourable decision by that court may call into question the overall financial balance. In all cases, instructing a specialist lawyer as soon as the call on the guarantee is received is essential to avoid losing rights.
Can a call on an independent guarantee be challenged if the beneficiary has itself committed faults?
In theory yes, if the beneficiary’s fault artificially brought about the breach it relies on; this is what is called manifest fraud through an “artificially provoked call”. In practice, however, this is very difficult to demonstrate within the urgency required by summary proceedings. The judgment of 1 April 2026 is an illustration: NIH argued that it was SNCF G&C itself that had abandoned the project and artificially brought about the forfeiture, but the French Supreme Court held that this argument did not make it possible to establish the “manifest” nature of the fraud, in particular because the administrative court seised of the challenge to the forfeiture had not yet ruled. To be able to oppose payment, the proof of the provoked fault would have to be indisputable and immediate, which is rarely the case in complex commercial disputes.
What happens if the independent guarantee is called while a dispute is pending before the administrative court?
This is precisely the situation dealt with by the judgment of 1 April 2026, and the answer is unequivocal: the existence of a pending administrative dispute is not enough to block payment of the independent guarantee. The civil judge is bound to order payment, even if the administrative court is seised of the lawfulness of the forfeiture that prompted the call. This is the direct consequence of the principle of independence of the guarantee: the beneficiary must not be forced to wait years for an administrative decision to recover its guarantee. However, the courts may structure the award as “to be set against” what the administrative court might order, so that the guarantor is not definitively wronged if that court rules in its favour. This coordination between the two court systems is a delicate point that requires a well-constructed litigation strategy.
What clauses should be negotiated to protect yourself before signing an independent guarantee?
Several mechanisms can significantly reduce the guarantor’s risk. The most important is a precise and exhaustive definition of the object of the guarantee: the more tightly the object is circumscribed, the harder it will be for the beneficiary to call the guarantee for reasons foreign to that object. It is also advisable to provide for a mechanism of progressive reduction of the guaranteed amount as the works or performance of the contract progress, a prior notification clause requiring a notice period before any call, and an obligation to give documented justification for the call. Where the underlying contract is governed in whole or in part by public law, it is essential to include in the guarantee a clause providing for the fate of the sums paid in the event of a favourable decision by the administrative court. Finally, ensuring that the duration of the guarantee is strictly aligned with that of the guaranteed obligations avoids automatic renewals that prolong the guarantor’s exposure.
Is the independent guarantee common in concession contracts or PPPs?
Yes, the independent guarantee is very frequently used in concession contracts, public-private partnerships (PPPs) and more generally in all real estate or infrastructure transactions of some size. It meets the need of the public body or granting operator to have solid financial security against any default by the private partner. From the private partner’s point of view (or that of its guarantor parent company), it represents a considerable financial commitment, often for amounts ranging from several million to several tens of millions of euros. The case under comment, with €47 million at stake, illustrates well the scale of the risks involved. If you are asked to sign an independent guarantee as part of such an arrangement, consulting a lawyer specialising in banking law and security law before signing is an essential investment.
1521 2281 max

Need Personalized Legal Advice?

Don’t face your questions alone. A lawyer can call you back for free to review your situation.

Need Personalized Legal Advice?

GDPR:

Similar Articles

emxn1y8qxwogdxbsb2fkeg55bgfilxn0dw50lxnncbpfa2xpbmcvyzytwjhoeuzpqudtsvbkvnlycvprqs8zedjfqv9yzwfsaxn0awnfyw5kx2vszwdhbnrfc2nlbmvfaw4ucg5n

Bullet Loan and Bank Liability: No Duty to Warn an Experienced Borrower (CA Paris, Pôle 5 ch. 6, 4 February 2026, No. 24/01960)

When a bank grants a bullet loan (prêt in fine) to a property holding company (société civile immobilière, SCI), can it be released from its ...

l'authentification forte en banque : comment sécuriser vos comptes et transactions en ligne

Strong Authentication in Banking: How to Secure Your Accounts and Online Transactions

Strong authentication in banking has become a major issue for securing accounts and online transactions. Since its gradual implementation in 2021, this measure aims to ...

task 01k95f1xxbengagbw2zp8y75yz 1762193989 img 1

IBAN Fraud: The Bank Is Not Liable If the Transfer Follows the Identifier Provided (Cass. com., 1 July 2026, No. 25-16.014)

You paid for a vehicle, a home or a service by bank transfer, copying the IBAN you were given. The money went to a stranger’s ...